Water infrastructure · Since 1989

Built to perform.
Engineered to last.

EPC delivery for wastewater treatment, sewage lifting, water pumping and transmission across Europe, the UAE and Libya.

EuropeUAELibya
Water treatment infrastructure in operation
EngineeringProcurementConstructionCommissioning

About the company

One delivery team across the water cycle.

Chemistry & Technology FIN combines technical coordination with practical field delivery, from project development and equipment procurement through installation, testing and operational handover.

1989Company foundation
3 regionsEurope, UAE and Libya
4 locationsRome, Dubai, Tripoli and Benghazi
EPCIntegrated turnkey delivery

Integrated capability

From process treatment to pumping, pipelines and controls.

One coordinated scope reduces interface risk and keeps performance, safety and handover aligned.

Modern wastewater treatment plant with aeration basins01

Wastewater treatment

Civil and process works, screening, biological treatment, clarification, sludge handling and tertiary treatment.

Municipal sewage lifting station equipment02

Sewage lifting

Wet and dry well stations, pumps, screens, penstocks, ventilation, lifting systems and standby power.

Large water transmission pipeline and pumping infrastructure03

Water transmission

Large-diameter pipelines, valve chambers, reservoirs, hydraulic interfaces and pumping systems.

Electrical control panels and automation systems04

Electrical and control

MCCs, VFDs, instrumentation, SCADA integration, testing, commissioning and operational handover.

Patented technology

VERBIT makes advanced wastewater treatment compact and scalable.

A modular process platform integrating inlet works, biological treatment, clarification, polishing, disinfection and sludge handling in one engineered system.

  • Compact modular treatment layout
  • Parallel treatment trains for scalable capacity
  • Controlled biological media distribution and mixing
  • Integrated polishing, disinfection and sludge handling
Enquire about VERBIT
VERBIT modular wastewater treatment system overview
Containerized prepackaged wastewater treatment units
Pre-assembled · Factory tested · Containerized

Prepackaged treatment units

Factory-built plants, ready to deploy.

Containerized MBBR and MBR wastewater treatment units for camps, villages, remote sites and interim municipal capacity. Treated water (BOD and TSS max. 10 mg/l) is suitable for irrigation reuse.

  1. 01
    MBBR packages

    200, 500 and 1,000 m³/day units; robust, simple to operate and low in energy.

  2. 02
    MBR package

    500 m³/day unit giving solids-free effluent in the smallest footprint.

  3. 03
    Modular capacity

    Units combine in parallel as population or flow grows.

  4. 04
    Where they fit

    Military and work camps, villages and small towns, hospitals, hotels, compounds, and bridge capacity while a permanent plant is built.

Selected experience

Water infrastructure across three regions.

Explore Italian and Libyan projects across treatment, pumping and transmission.

Villanova wastewater treatment plant
Italy projectVillanova, Italy

Villanova wastewater treatment plant

Design participation and execution of civil, process, mechanical and electrical treatment-plant works.

Wastewater treatment plant near Rome
Italy projectLazio, Italy

Wastewater treatment plant near Rome

Design and construction participation for a municipal treatment facility serving 35,000 inhabitants.

Pavona wastewater treatment plant
Italy projectPavona, Lazio, Italy

Pavona wastewater treatment plant

Execution of treatment works, process pipework, equipment interfaces, testing and handover.

Pordenone municipal wastewater plant
Italy projectPordenone, Italy

Pordenone municipal wastewater plant

Municipal treatment works integrating civil structures, mechanical systems and control interfaces.

Aprilia wastewater treatment plant
Italy projectAprilia, Lazio, Italy

Aprilia wastewater treatment plant

Design and works supervision with process, hydraulic and civil works for a municipal treatment plant.

ACEA ATO 2 water systems
Italy projectLazio, Italy

ACEA ATO 2 water systems

Testing of lifting stations, water plants and treatment plants, with hydraulic design of aqueducts and sewers.

Chiauci dam works
Italy projectTrigno river, Italy

Chiauci dam works

Testing of the steel bridge over the Trigno river and the retaining wall on the reservoir slopes.

Great Man-Made River connections
Libya projectTripoli and Misurata, Libya

Great Man-Made River connections

Large-diameter pipeline installation, valve interfaces, testing and civil works coordination.

Al-Marj municipal wastewater plant
Libya projectAl-Marj, Libya

Al-Marj municipal wastewater plant

Turnkey EPC delivery covering process, civil, mechanical, electrical and control systems.

Sebha sewage lifting and conveyance
Ongoing programmeSebha, Libya

Sebha sewage lifting and conveyance

A main lifting station, satellite stations and rising main delivered as an integrated EPC programme.

Engineer inspecting pumping station equipment and controls
Coordinated engineering and controls

Execution discipline

Performance depends on the interfaces.

Hydraulics, process, mechanical, electrical and controls are developed as one operating system.

  1. 01
    Define the duty

    Duty points, head losses, surge conditions and operating envelopes.

  2. 02
    Select for lifecycle value

    Fit-for-purpose equipment, redundancy and maintainability.

  3. 03
    Integrate power and automation

    MCC/VFD logic, instrumentation and SCADA interfaces.

  4. 04
    Commission and hand over

    Testing, performance verification, training and documentation.

Start a conversation

Let's build the next water system.

Engineering. Procurement. Installation. Commissioning.

[email protected] www.chemtechfin.com
ItalyRome officeVia dei Colli della Serpentara 3, Roma
DubaiMiddle East office
LibyaTripoli · Benghazi